Palisades Fire Rebuild Architect
We’re helping Pacific Palisades families rebuild after the January 2025 fire, with homes designed for how you live now and built for the next fire season.
Schedule a consultation Call (310) 546-5550Rebuilding after the Palisades fire: where to start
If your home was lost in the Palisades fire, you have two main paths in the City of Los Angeles. You can rebuild like-for-like under the Mayor’s Emergency Executive Order 1, which allows a home within 110 percent of the original footprint and height and skips coastal and environmental review. Or you can design something bigger or different, which takes longer and may need a Coastal Development Permit.
Either way, the new home has to meet today’s wildfire building standards. We’re designing rebuilds in the Palisades now, and we can help you choose the right path.

Why Palisades families call us
We’re a residential firm just down the coast in Manhattan Beach. We’ve spent years designing custom homes in coastal-zone cities and on hillside lots, from the beach cities to Palos Verdes to the mountains near Aspen. That experience transfers directly to the Palisades.
We also start by listening. A lot of families don’t want the same house back. They want the home they would have built if they’d started from scratch, within what insurance and the rules allow. Others loved their house and want it back as close as possible, only safer. Both are fine. We lay out the options, with honest numbers, and you decide.
Like-for-like or redesign? Comparing your options
Like-for-like rebuild (EO 1)
What it allows: a new home within 110% of the pre-fire footprint and height. Per the City’s January 2026 guidance, the test is footprint and height, not square footage, and existing non-conforming setbacks can stay.
What it skips: Coastal Development Permit, CEQA and Mello Act review.
Best for: getting home as fast as possible, or bringing back a design you loved.
Bigger or different
What it allows: a design beyond the 110% envelope, or a substantially different house, where zoning allows.
What it adds: lots in the coastal zone may need a Coastal Development Permit. The City created a streamlined coastal process under Emergency Executive Order 8, but it still takes longer than Path 1.
Best for: families who want to change how the house works.
Rules keep changing. The City has updated its rebuild orders several times since January 2025. This page reflects the City’s guidance as of early 2026, and we check the current executive orders and LADBS requirements on every project. The City’s recovery site, recovery.lacity.gov, has the latest official information.
Designing a home for the next fire season
Much of the Palisades is a very high fire hazard severity zone, which means new homes have to meet California’s wildfire-resistant construction standards. In practice, that covers:
- Class A fire-rated roofing
- Ember-resistant vents, so wind-blown embers can’t get into the attic or crawlspace
- Noncombustible or ignition-resistant siding, decking and trim
- Dual-pane windows with tempered glass
- Enclosed eaves and soffits
- Fire sprinklers, which new California homes need anyway
Some of the most effective protection costs very little if it’s designed in from the start: a noncombustible strip right around the house with no mulch, wood fences or plants touching the walls; gutters that don’t collect leaves; and decks and fences detailed so they can’t carry fire to the house. We design landscape in-house, so the yard and the house are planned together.
How we work, in about 90 seconds
Rebuilding is a big deal, and getting the plan right is how you build it right. For a Palisades rebuild, the first phase also covers your insurance coverage and the records of your original home, which set the baseline for a like-for-like rebuild.
- ListenWhat you want in your home, and what you want to spend.
- First SketchA first idea on paper, so you can react to something real.
- You ApproveThe layout works for how you live, and it fits the budget.
- Plans and PermitsWe draw the full set of plans and handle the city.
- Fine-TuneWe go back and forth on the details with you, so there are no surprises for your builder.
- Build With YouOnce construction starts, we are still here.
Homes we’ve designed
From the beach cities to the Rockies. Every one started with a simple conversation.







Best of BusinessRate 2025: Architect, Manhattan Beach
Named best architect in Manhattan Beach by BusinessRate for 2025, a ranking based on recent client reviews.
Our work has been featured in DIGS, Modern Luxury Interiors and Aspen Magazine.



Questions we hear a lot
Can I rebuild a bigger house after the Palisades fire?
Yes, but it changes the process. Under the City of Los Angeles’ Emergency Executive Order 1, a like-for-like rebuild can go up to 110 percent of the original home’s footprint and height without coastal or environmental review. Going beyond that is possible where zoning allows, but it’s a separate path that can require a Coastal Development Permit and more time.
What does like-for-like mean for a Palisades rebuild?
It means rebuilding a home within 110 percent of the original home’s footprint and height. According to the City’s guidance, the test is footprint and height rather than square footage, and existing non-conforming setbacks can stay. The new home doesn’t have to be an exact copy of the old one.
Do Palisades rebuilds have to meet new fire codes?
Yes. New homes in very high fire hazard severity zones have to meet California’s wildfire-resistant construction standards, including fire-rated roofing, ember-resistant vents, tempered glass and ignition-resistant exterior materials. We design to those standards and suggest low-cost upgrades that go further.
How long does a Palisades rebuild take?
It depends on the path. Like-for-like rebuilds move faster because they skip discretionary review. Projects that go bigger or need a Coastal Development Permit take longer. Plan check, utilities and contractor availability all affect the schedule, so we give each family a timeline based on their lot and their path.
Can you help with insurance paperwork?
We can provide what an architect can: drawings of the new home, documentation of the original home’s size and features from permits and photos, and design options at different cost levels. Coverage questions should go to your insurance adjuster or a public adjuster.
Do you also work on Eaton fire rebuilds in Altadena, or in Malibu?
Our current fire rebuild work is in the Pacific Palisades. Altadena is in unincorporated Los Angeles County and Malibu is its own city, so the rules are different in each. Call us and we’ll tell you honestly whether we’re the right fit for your project.
Ready to talk about rebuilding?
We’ll go over what you had, what you want now, and the fastest way to get there. Every home we’ve designed started with a simple conversation.
Schedule a time (310) 546-5550GTA Design Group Architects Inc. · 2100 N Sepulveda Blvd, Suite 44, Manhattan Beach, CA 90266